Jasper Hills

Jasper Hills

Jasper Hills is located 50km from Brightstar’s existing processing facility along a wholly-owned private haul road, allowing unimpeded, direct access to both projects.

The project is permitted, previously mined and production ready and was last mined in 2020 with 23,000oz Au produced.

The project hosts a mineral resource of 293k oz at 1.9g/t Au.

A scoping study released in March 2024 concluded that open pit mining at the Lord Byron deposit could provide baseload processing feed while underground mining from the Fish deposit could supply potential high-grade ore of up to and above 4g/t Au.